PROJECT: MAW Engineering
LOCATION: Creagh Industrial Estate, Toomebridge
CLIENT:MAW Engineering
CONSULTANT: H M Electrics Ltd
CONTRACT PERIOD: 9 Months
MAW Engineering, a Trailer and Truck Body Specialist, manufacturing Walking Floor, Boxvan, Tipper, Rigid and Drawbar Trailers.
H.M. Electrics Ltd has completed a full electrical installation to this new commercial engineering and manufacturing facility. Working alongside the client every step of the way to tailor bespoke solutions to their requirements as they develop their plans to incorporate manufacturing possibilities enabling production to be as efficient as possible.
As work progressed so did the demands of our client and the further we were able to advise, develop and install, ensuring not only value for money but also quality was at the forefront of this project. The commercial unit consists of new mains three phase powers supply including liaison with NIE. A complete switchgear and Distribution board supply to various locations within the factory. Cable containment and cabling throughout. Power distribution to 415v, 230v and 110v equipment. Bespoke lighting solutions for both the office and manufacturing factory to include both general and emergency lighting and external lighting. Data cabling and communications systems. Protective services to consist of a fire and disabled toilet alarms and intruder alarm system. Complete with a CCTV installation.
All works involved have been successfully tested and commissioned with an informal handover to the client with full demonstrations.